(1) A building surveyor is not to grant an application for an occupancy permit in respect of which a report is required under the Building Regulations from a reporting authority unless the report is supplied to the building surveyor.(2) A building surveyor is taken to have been supplied with a required report if the reporting authority fails to supply it within the prescribed period.