WORK HEALTH AND SAFETY (MINES) REGULATIONS 2022 - REG 737

737 .         Notices of high risk mining activity

                The mine operator of a mine is taken to have complied with regulation 675UK(2) in relation to a high risk mining activity listed in column 1 of the Table and occurring before, on and after commencement day if, before commencement day, the action under the MSIA that is listed opposite the high risk mining activity was taken in relation to the activity.

Table

Column 1

High risk mining activity

Column 2

Action under MSIA

Schedule 23 item 1

Written notification was provided under the MSIR regulation 12.3(1) in relation to the mine shaft

Schedule 23 item 2 in relation to installing a winding system

Written notification was provided under the MSIR regulation 11.3(1) in relation to the winding system

Schedule 23 item 2 in relation to making major changes to an already installed winding system

Written notification was provided under the MSIR regulation 11.6(1) in relation to the modification of the winding system

Schedule 23 item 3

The winding system was approved under the MSIR regulation 11.4 and tested under the MSIR regulation 11.5

Schedule 23 item 4

The method was approved by the senior inspector under the MSIR regulation 10.21(1)

Schedule 23 item 7

Written advice was provided to the district inspector under the MSIR regulation 10.19(2)(a) in relation to the construction

Schedule 23 item 8

Written notification of the fuel storage or refuelling facility was provided under the MSIR regulation 10.58(1)

Schedule 23 item 10

Application for approval for the use of the dredge was sought under the MSIR regulation 14.4(5)

Schedule 23 item 11

Approval of the commencement of mining operations was sought under the MSIA section 42 in relation to the tailing storage facility

Schedule 23 item 12(a)

Notification of the use of the explosives in reactive ground was given under the MSIR regulation 8.55(2)

Schedule 23 item 12(b)

Notification of the use of the explosives in hot ground was given under the MSIR regulation 8.54(3)

Schedule 23 item 13

Approval of the commencement of mining operations was sought under the MSIA section 42 in relation to the mobile plant or production drilling plant

Schedule 23 item 14

Provision of complete details of the high voltage installation occurred under the MSIR regulation 5.18(2)(a)