Western Australian Current Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

WORK HEALTH AND SAFETY (MINES) REGULATIONS 2022 - REG 641D

641D .         Earthing systems

        (1)         The mine operator of a mine must ensure the following —

            (a)         any earthing system installed in a quarry operation or an underground mine is connected to the earthing system established at the surface of the mine by means of a continuous earthing conductor;

            (b)         no earthing electrode is installed in a quarry operation or an underground mine;

            (c)         the neutral point of an alternating current electrical system is effectively earthed to the main earthing system;

            (d)         an earthing system that incorporates an impedance complies with the requirements for protection against indirect contact in AS/NZS 3007:2013;

            (e)         any single phase alternating current apparatus that is installed in a quarry operation or an underground mine is supplied from a double wound transformer having 1 pole of the secondary winding connected to earth.

        Penalty for this subregulation:

            (a)         for an individual, a fine of $7 000;

            (b)         for a body corporate, a fine of $35 000.

        (2)         Subregulation (1)(a), (b) and (e) do not apply to installations in any parts of quarry operations that are safe distances from places where electrical shot firing methods are employed.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback