WORK HEALTH AND SAFETY (MINES) REGULATIONS 2022 - REG 306H

306H .         Documents required at construction site where tilt‑up work done

                The principal contractor at a construction site must ensure that at all times when tilt‑up work is being done at the site there is kept at the site —

            (a)         if a concrete panel that is, or is to be, involved in the work was manufactured at a place other than the construction site, the copy of the notification to the regulator given under regulation 306B(4) to the principal contractor in respect of the panel; and

            (b)         if a concrete panel that is, or is to be, involved in the work was manufactured at the construction site, a copy of the notification under regulation 306B(2) given to the regulator in respect of the panel; and

            (c)         a copy of any exemption under Part 11.2 relating to the work; and

            (d)         a copy of the shop drawings of each concrete panel that is, or is to be, involved in the work; and

            (e)         a current plan setting out details of the proposed execution of the work; and

            (f)         a copy of any written or diagrammatic advice, from a qualified practising engineer, received by the principal contractor, that sets out the manner in which an aspect of the work should be executed; and

            (g)         in relation to each concrete panel that is, or is to be, involved in the work, a copy of the inspection report for that panel referred to in regulation 306C(1)(d) or (2)(d), as is relevant to the case.

        Penalty:

            (a)         for an individual, a fine of $7 000;

            (b)         for a body corporate, a fine of $35 000.