(1) A person who, at a
workplace (other than a construction site) where a concrete panel is proposed
to be manufactured, is a person conducting a business or undertaking must
ensure that the regulator is notified of the proposed work at least
10 working days before the panel is proposed to be cast.
(2) A person who, at a
construction site where a concrete panel is proposed to be manufactured, is
the principal contractor must ensure that the regulator is notified of the
proposed work at least 10 working days before the panel is proposed to be
cast.
(3) A notice under
subregulation (1) or (2) must be made in the approved form and in
the manner approved by the regulator and must specify —
(a) the
construction site or other workplace at which the proposed manufacturing work
is to take place; and
(b) the
construction site at which the panel is to be incorporated as a wall
(including a retaining wall) once the process by which the panel is
manufactured is complete.
Penalty for this subregulation:
(a) for
an individual, a fine of $7 000;
(b) for
a body corporate, a fine of $35 000.
(4) A person referred
to in subregulation (1) (other than the regulator) must ensure that a
copy of the notice is given to the principal contractor at the construction
site referred to in subregulation (3)(b) within the period referred to in
subregulation (1).
Penalty for this subregulation:
(a) for
an individual, a fine of $1 450;
(b) for
a body corporate, a fine of $7 000.