GENERAL OUTLINE
  The State Development and Public Works Organisation Act 1971 is `An
Act which provides for State planning and development through a
coordinated system of public works organisation, for environmental
coordination, and for related purposes.'
  The original Act was first passed in 1938 as a post Depression measure
to create employment and to develop the State, through a system of
coordinated public works.
  The Act was substantially revised and updated in 1971 when specific
powers relating to supervision of the environment were introduced to the
Act (which were subsequently amended in 1978).
   The Act was further amended in 1999, clarifying the
Coordinator-General's role in coordinating impact assessment for
significant projects; enabling the Coordinator-General to acquire and access
land for persons other than the State, and updating enforcement provisions
for land use established within a state development area.


Objectives of The Legislation
  The proposed amendments seek to make a number of modifications to
the State Development and Public Works Organisation Act 1971 (SDPWO
Act), the Environmental Protection Act 1994, the Integrated Planning Act
1997 (IPA), the Electricity Act 1994 and the Mineral Resources Act 1989
(MR Act).
   The amendments to the SDPWO Act are principally needed to reflect
recent changes to other legislation dealing with environmental impact
assessment, together with further recognition of the changing role in
government in the provision of infrastructure.

 


 

2 State Development and Other Legislation Amendment The amendment to the IPA provides for the Minister to proceed straight to designation for community infrastructure projects having coordinated assessment of the environmental effects under section 29A of the SDPWO Act. The amendments to the EP Act and the MR Act indicate that the provisions of the Act relating to the assessment of environmental impacts for mining projects do not apply to projects declared significant projects under the SDPWO Act. The amendments to the Electricity Act 1994 are needed to facilitate the development of the Australian Magnesium Corporation Plant to be located adjacent to the Stanwell Power Station by ensuring that the Plant is not required to comply with emergency rationing orders or restriction regulations for its minimum electricity demand. The Bill amends the SDPWOA to: · reflect the changes to the assessment of mining which have occurred with the transfer to the Environmental Protection Agency of the environmental regulation of the mining industry from the Department of Mines and Energy. The amendments will maintain the Coordinator-General's ability to coordinate impact assessment for significant projects which require an Environmental Authority (Mining Lease); · provide clarification of administration and enforcement provisions for conditions attached to development approvals issued following the completion of an EIS for a significant project pursuant to section 29B of the Act; · provide linkages between the assessment of environmental effects under section 29 and the designation of community infrastructure pursuant to the IPA; · provide for the Coordinator-General to delegate and transfer authorised works under sections 68 and 84; · provide for the Coordinator-General to take an interest in land less than fee simple, including an easement, for persons other than the State, for the purposes of section 78;

 


 

3 State Development and Other Legislation Amendment · update the finance provisions contained in Part 9 to reflect changes to the Statutory Bodies Financial Arrangements Act 1982 (SBFA Act). The amendments will enable the Coordinator-General to borrow moneys from the Queensland Treasury Corporation without the need to obtain the prior approval of the Governor-in Council, as a Statutory Body under the SBFA Act; · provide for the Coordinator-General to enforce the regulation of the use by the public of lands or property vested in or under the management of or control of the Coordinator-General under section 121; · provide for the Coordinator-General to prepare regulations for the requirements for environmental impact statements or processes, such as those proposed to be accredited under the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act); · include in the transitional provisions the ability for the Coordinator-General to declare as a significant project, a project which include lands intended to be designated as community infrastructure pursuant to IPA for which a study about the environmental effects of the proposal was being undertaken. Reasons For The Bill The attached Bill amends the SDPWOA to provide clarification as to the administration and enforcement provisions for conditions attached to a development approval granted following the completion of an EIS for a significant project pursuant to s. 29B of the Act. The amendments clarify that from the time that a development approval takes effect, the Coordinator-General's (COG) involvement ceases. The amendments provide for the COG's report to identify the agency to administer any conditions required to be attached to a development approval. Resolution of this issue originally raised by the government departments will clarify agency responsibilities in relation to the administration of development approvals. In the case of the administration of the EP Act, the amendment will provide for the enforcement of conditions within the jurisdiction of the EPA by the use of Environmental Protection Orders if needed.

 


 

4 State Development and Other Legislation Amendment The Bill amends the SDPWO Act, EP Act 1994 and the Mineral Resources Act 1989 to enable the Coordinator-General to maintain an ability to coordinate the assessment of environmental impacts through the preparation of an Environmental Impact Statement (EIS) for significant projects which involve an environmental authority (mining lease) pursuant to the new arrangements within the EP Act. The amendments respond to the recent transfer of responsibility for the environmental assessment of mining from the Department of Mines and Energy to the Environmental Protection Agency. The provisions will enable the assessment of those mining projects declared by the Coordinator-General to be significant projects pursuant to section 29C to be coordinated through the provisions of the SDPWO Act rather than the provisions of the EP Act. The Bill amends section 78 to provide that the Coordinator-General may acquire land less than an estate in fee simple as is currently provided in the Act. Specifically, it provides for the acquisition of an easement. This amendment relates to the acquisition of land by the Coordinator-General for the purposes of an infrastructure facility, including those facilities, which are to be built, owned, operated and maintained by persons other than the State. This amendment will provide for situations where the limitation on taking land in fee simple would result in unnecessary hardship for landowners where an easement or lesser title may be more appropriate. It is expected that this amendment will have application in the facilitation of pipeline proposals in the State such as the PNG gas pipeline. The Bill amends Part 7 of the SDPWO Act in the interests of legislative consistency and currency, to replace the COG's current express financial powers with a cross-reference to the relevant provisions of the Statutory Bodies Financial Arrangements Act 1982 (SBFA Act). The amendments provide that the COG is a statutory body for under the SBFA Act. Part 7 of the SDPWO Act empowers the COG to borrow, raise money or make financial arrangements, including the power to issue debentures, bonds and stock. Part 7 of the Act also contains a range of provisions relating to the exercise of these powers. A number of these provisions contained cumbersome approval requirements and many were outdated in their references to other Acts. The amendments maintain the objectives of the Acts.

 


 

5 State Development and Other Legislation Amendment ESTIMATED COSTS FOR GOVERNMENTAL IMPLEMENTATION Any costs incurred are a result of the amendments to the Act in respect to drafting and preparation of the Bill represent a minimal cost to Government. In other words, the impact of the changes should be `Budget neutral'. RESULTS OF CONSULTATION The proposed amendments have been supported. CONSISTENCY WITH FUNDAMENTAL LEGISLATIVE PRINCIPLES The Bill raises two Fundamental Legislative Principles issues with respect to: · commencement provisions; and · retrospective commencement for subsection 1 and the partial exclusion of the Acts Interpretation Act 1954, s15DA for subsections (3) and (4). The commencement provisions provide for the provisions relating to the assessment of mining projects to commence by Proclamation up to two years after the date of assent. Because of the potential implications of the Alternative State Provisions on this part of the Act, the timing for their commencement has been made to enable consultation with the Commonwealth Government should any issues arise which could otherwise have the provisions set aside. Retrospective commencement in the provisions relate only to the administration and enforcement of conditions attached to a development approval granted following the completion of an EIS for a significant project. This retrospective commencement will not affect any interests but will provide clarification as to the ability of State agencies such as the EPA, to fully administer and enforce conditions attached to a development approval.

 


 

6 State Development and Other Legislation Amendment CONSULTATION The following relevant organisations have been consulted: Department of the Premier and Cabinet Department of Communication and Information, Local Government and Planning Environmental Protection Agency Queensland Treasury Crown Law NOTES ON CLAUSES The section numbers in the State Development and Other Legislation Amendment Bill 2000 are referred to as clauses in these explanatory notes. PART 1--PRELIMINARY Clause 1 states that the short title of the Act is the State Development and Other Legislation Amendment Act 2000. Clause 2 provides that section 29PA of the SDPWO Act is taken to have to commenced on 16 June 1999 and that the remaining provision of the Act commence on a day to be fixed by proclamation but not more than 2 years from the date of assent. PART 2--AMENDMENT OF THE ELECTRICITY ACT 1994 Clause 3 defines the Act amended in Part 2 as being the Electricity Act 1994.

 


 

7 State Development and Other Legislation Amendment Clause 4 inserts a new division in chapter 5, part 2 of the Electricity Act 1994. Section 129A applies to the Stanwell Magnesium Plant, and stipulates that regulations or rationing orders under sections 122 and 124 of the Electricity Act 1994, can only apply to the electricity demand at the Plant that is greater than an amount prescribed by regulation. This prescribed amount must be at least 50 MW but no more than 100 MW. The Australian Magnesium Operations magnesium metal project will be located at Stanwell inland from Rockhampton and as such, a large proportion of the benefits from the development and operation of this plant will accrue to the Fitzroy region and also possibly Gladstone/Calliope. The project will provide significant economic benefits to the region and create skilled and unskilled jobs during construction and operation. Smelters of various kinds are concerned about security of electricity supply. If electricity supply is interrupted for sufficiently long periods, molten metal can solidify in "baths" or "pots". The cost required to clear the equipment of solid metal is substantial, and significant losses in production time would also result. Therefore, given the significant economic benefits of this project, legislative protection of the minimum electricity supply to the smelter has been created to cover these potential commercial and sovereign risks, to ensure the future development of this project. This protection is given by restricting the operation of sections 122 and 124 of the Electricity Act 1994, so that any emergency rationing orders or restriction regulations only apply to the plant's demand in excess of their minimum demand level (initially 50 MW). This minimum demand level is expected to change in future with the anticipated expansion of the plant, hence the proposed amendments provide for the minimum demand level to be prescribed by regulation. The division expires on 31 December 2033.

 


 

8 State Development and Other Legislation Amendment PART 3--AMENDMENT OF THE ENVIRONMENTAL PROTECTION ACT 1994 Clause 5 defines the Act amended in Part 3 as being the Environmental Protection Act 1994. Clause 6 amends section 34(1) of the Environmental Protection Act 1994 (EP Act) to clarify that the Environmental Impact Statement (EIS) process under the EP Act does not apply to a significant project as declared under section 29B of the SDPWO Act on the basis that Part 4 of that legislation provides for an EIS process for significant projects. Clause 7 amends section 34AW of the EP Act by declaring that for the purposes of an application for an environmental authority under the EP Act where an EIS process must be completed, that process will be taken to have been completed where the application relates to a significant project and where the COG has issued a report on the EIS for the project under Part 4 of the SDPWO Act and that report has been given to the proponent. This will mean that wherever there is an EIS requirement for an environmental authority for mining activities under the EP Act, that requirement will be taken to have been met in the case of a significant project where the EIS process under the SDPWO Act has been completed. Clause 8 amends section 34FD of the EP Act. Part 2C of the EP Act (in which section 34FD is located) relates to environmental authorities required for mining activities. Essentially, there are two types of application for such environmental authorities--standard or non-standard. A standard application is intended to cover a project of low labour and operational requirements. The amendments to section 34FD(3)(a) and (b) in effect provide that where an application is for an environmental authority (mining lease) as part of a significant project then the application will be treated as a non-standard application. Clause 9 amends section 34FF of the EP Act. That section currently provides that where an application is a non-standard application the administering authority must specify that an EIS is required. The amendment makes clear that no EIS will be required where the application for the environmental authority (mining lease) is part of a significant project. This is because the issue of an EIS for such a matter would have been addressed under the SDPWO Act Part 4.

 


 

9 State Development and Other Legislation Amendment Clause 10 amends section 34FG in a similar manner to the amendment to section 34FD. Section 34FG allows the Minister administering the EPA (EPA Minister) to make a decision about the assessment level of an application, ie whether it is non-standard or standard. Consistent with the amendment to section 34FD, the EPA Minister cannot make an assessment level decision on an application for an environmental authority relating to a significant project which application must be treated as a non-standard application. Clause 11 amends section 34GS(1) of the EP Act which relates to the content requirements of an EMOS which must be submitted as part of an application for an environmental authority (mining lease) where it is a non-standard application. The amendment requires the EMOS to state whether an EIS under the SDPWO Act has been prepared for the project. Clause 12 amends section 34GU which sets out the entitlement of the administering authority for an environmental authority (mining lease) to give an applicant an assessment report about a submitted EMOS relating to that application. The ability of the administering authority to give such an assessment report does not apply if the application relates to a significant project, an EMOS is included as part of the EIS process under the SDPWO Act for that project and the COG in giving his report on the project states that the EMOS complies with or substantially complies with the content requirements for an EMOS under section 34GS of the EP Act. Clause 13 amends section 34GV subclause (b) by limiting the ability of the EP Act administering authority upon an application for an environmental authority (mining lease) to make an EMOS assessment report. In making its assessment report, the administering authority must, where the application relates to a significant project, consider the EIS prepared under the SDPWO Act and the COG's report thereon. Clause 14 amends section 34GY(2)(a) and (b) of the EP Act, which deals with the conditions which an administering authority, may apply in the case of a standard application for an environmental authority (mining activities). The introduction of new subclause (2)(b) requires the administering authority to include in the draft environmental authority relating to a mining lease which is part of a significant project any conditions to the environmental authority which are stated in the COG's report for the project made under the SDPWO Act.

 


 

10 State Development and Other Legislation Amendment The ability of the administrating authority under the EP Act to include additional conditions in such an authority is limited by the amendment to section 34GY(6) to the extent that any additional conditions cannot be inconsistent with the conditions stated in the COG's report with respect to the environmental authority for a significant project. Clause 15 amends section 34GZ relating to the conditions for a non-standard application for an environmental authority (mining lease) in the same manner as the amendments to section 34GY relating to a standard application. It seeks to preserve the applicability of any conditions to the draft environmental authority stated in the COG's report so that those conditions are included in the draft authority and there can be no additional inconsistent conditions imposed under the EP Act. Clause 16 amends section 34HF of the EPA which gives a legal right to any party to object to an application for an environmental authority, or the draft environmental authority or a condition included in the draft. The introduction of new subsection 2A is to the effect that no person, with the exception of a native title party, can object to a condition included in the draft environmental authority relating to a significant project where that condition was included in the COG's report on the significant project. The introduction of new subsection (4) of section 34HF is to make clear that an objection to an application for an environmental authority is an objection relating to the application and not to any of the application documents which would include an EIS. That is, ancillary documents such as the EIS will not be open to objection. Clause 17 amends section 34HL of the EP Act which sets out the type of decision which the Land and Resources Tribunal (Tribunal) can make when an objection is made to an application for an environmental authority (mining activities). The Tribunal has the power to recommend to the Minister administering the MR Act (MRA Minister) that the application be granted upon stated conditions that are different to the conditions in the draft environmental authority. The introduction of subsection (1A) makes clear that no such recommendation can be made which would either exclude conditions recommended by the COG under a report on a significant project under the SDPWO Act or which would include conditions which are inconsistent with any such conditions included in the COG's report.

 


 

11 State Development and Other Legislation Amendment Clause 18 amends the EP Act by deleting existing section 34HN and introducing a new section. The new section requires the EPA Minister, after the recommendations of the Tribunal on an objection to an environmental authority (mining lease) have been made, not only to seek advice from the MRA Minister on the decision but also where the application relates to a significant project, seek the advice of the Minister administering the SDPWO Act (State Development Minister). Clause 19 amends section 34HO. Currently the section requires the EPA Minister when considering granting an environmental authority (mining activities) to consider any conditions for the environmental authority recommended by the COG under the SDPWO Act. Presently, section 34HO(4) does not require the EPA Minister to impose such a recommended condition. To reflect the amendment to the SDPWO Act by the introduction of section 29W thereto which allows the COG's report on the EIS for a significant project to state conditions for the proposed environmental authority (mining lease) relating thereto, which conditions will be taken to be imposed on any environmental authority to be issued, The introduction of new section 34HO(3)(b) is to the effect that the EPA Minister must consider the conditions included in the draft environmental authority for standard or non-standard applications. Clause 20 amends section 34KQ(1)(f) to reflect the amendments to section 29W of the SDPWO Act which allows the COG's report on the EIS process for a significant project to state conditions for an environmental authority (mining lease) relating thereto. Clause 21 introduces a new section 34KRA which provides that if in an environmental authority (mining lease) relating to a significant project which includes conditions stated in the COG's report for the project, there is any inconsistency between those conditions and any other conditions placed on the environmental authority the COG's conditions, will prevail to the extent of any inconsistency. Clause 22 amends schedule 4 by introducing the definitions of "significant project" and "Coordinator-General's report" consistent with those in the SDPWO Act.

 


 

12 State Development and Other Legislation Amendment PART 4--AMENDMENT OF THE INTEGRATED PLANNING ACT 1997 Clause 23 defines the Act amended in Part 4 as being the Integrated Planning Act 1997. Clause 24 amends section 2.6.8 of the Integrated Planning Act 1997 (IPA) which deals with community infrastructure designation. The amendment provides that where the Minister may proceed straight to designation (using the process set out in Schedule 7 of IPA), if the Minister is satisfied that the Coordinator-General (COG) has coordinated the assessment of environmental effects of the community infrastructure in accordance with section 29A of the SDPWO Act. This amendment clarifies that the Minister may proceed to designation after assessment has been completed for both a significant project (for which a report is prepared pursuant to section 29K of the SDPWO Act) or, for which the environmental effects have been assessed pursuant to section 29A(1) which provides that the COG coordinate departments of the Government and local bodies throughout the State to ensure that in any development proper account is taken of the environmental effects. The "Policies and Administrative Arrangements--Impact Assessment in Queensland" document, commonly referred to as "the Green Book", applies to the assessment of environmental effects undertaken pursuant to section 29A(1). PART 4A--AMENDMENT OF THE MINERAL RESOURCES ACT 1989 Clause 25 defines the Act amended in Part 4A as being the Mineral Resources Act 1989. Clause 26 deletes section 276(5) to reflect the changes in the SDPWO Act which confirms that the conditions in the COG's report are included in the Mining Lease for a significant project.

 


 

13 State Development and Other Legislation Amendment PART 5--AMENDMENT OF THE STATE DEVELOPMENT AND PUBLIC WORKS ORGANISATIONON ACT 1971 Clause 27 defines the Act amended in Part 5 as being the State Development and Public Works Organisation Act 197 Clause 28 amends the definitions in section 5 of the State Development and Public Works Organisation Act 1971 (SDPWO Act) to amend the definition of "local bod The "local bodies" definition is amended to remove an outdated reference to the Local Bodies Loan Guarantee Act 1923 which has been repealed. The amended definition provides that a `local body' is a government owned corporation; or a statutory body as defined in the Statutory Bodies Financial Arrangements Act 1982; or another body established under an Act. Clause 29 inserts the following definitions for Part 4--Environmental Coordination: "approval" includes authority, lease, licence, permit or other approval. "Coordinator-General's report", for an EIS, means the report the Coordinator-General must prepare under section 29K(3). "environmental authority (mining lease)" means an environmental authority (mining lease) under the Environmental Protection Act 1994. "EPA Minister" means the Minister for the time being administering the Environmental Protection Act 1994. "Environmental Protection Act" means the Environmental Protection Act 1994. "Integrated Planning Act" means the Integrated Planning Act 1997. "Mineral Resources Act" means the Mineral Resources Act 1989. "MRA Minister" means the Minister for the time being administering the Mineral Resources Act 1989.

 


 

14 State Development and Other Legislation Amendment The insertion of the 'approval' definition provides for the range of approvals that may require EIS under other legislation. The remainder of the definitions reflect changes in other legislation related to Environmental Coordination, which are addressed in subsequent amendments to the SDPWO Act. Clause 30 inserts a new section 29B(4) which provides that if the project involves a proposed environmental authority (mining lease), the Coordinator-General (COG) must give a copy of the gazette notice to the EPA and MRA Ministers. Previously this subsection required the COG when declaring a project to be a significant project, for which an EIS was required, to give a copy of the gazette notice of the declaration to the MRA Minister. This notice will now be given not only to the MRA Minister but also to the EPA Minister. Clause 31 amends section 29K by replacing subsection 4 to specify what the COG may do in evaluating an EIS for a significant project. Specifically, it clarifies that the COG may state conditions under section 29O, 29S or 29W; and recommendations about the project or a matter related to the project under section 29Q or 29Y and for community infrastructure as mentioned in section 29R. Furthermore, new subsection 5 provides for the public notification of the COG's report. This provision provides for the outcome of the EIS process to be made publicly available by the placement on a website of the COG's report. This process is consistent with that in other legislation, in particular Commonwealth environment legislation. The COG's report will be placed on the website of the Department administering the Act, currently the Department of State Development. Clauses 32 and 33 insert a subdivision dealing with the relationship of the SDPWO Act and development approvals granted pursuant to IPA. Clause 34 amends section 29M to provide that the COG's conditions are treated as concurrence agency conditions until a development approval pursuant to IPA takes effect. This provision provides the COG with the same powers as a concurrence agency including the ability to amend conditions in the same way concurrence agencies may in the IDAS process pursuant to IPA before a decision is made by the assessment manager.

 


 

15 State Development and Other Legislation Amendment Clause 35 amends section 29O to clarify that the COG's conditions apply only to the development approval which has been the addressed in the EIS and not for each development approval required for the project. These changes to section 29O clarify that the conditions stated in the COG's report are only to be attached to those development approvals for the project which have been assessed during the EIS process. While it is intended that proponents are able to benefit from the assessment of all development approval requirements for a project through the conduct of a coordinated assessment process, it is sometimes the case that there is insufficient detail available about future development approvals required at the time of the preparation of the EIS, and that further development assessment processes will be required. This situation occurs in the case of operational approvals in the form of "environmentally relevant activities" which require an application for a material change of use pursuant to IPA. The proper assessment of other development approvals which might be required for a project but which have not been considered during the EIS, or for which there has been insufficient material provided during the EIS are not precluded because of the assessment process coordinated by the COG. The new section 29O(2A), provides clarification that following the completion of the COG's report the assessment manager's powers to assess the development application and impose conditions are not altered. Any additional conditions imposed by the assessment manager must not be inconsistent with conditions stated in the COG's report. This section clarifies that the assessment manager can impose its own conditions on an approval in accordance with its powers contained in IPA. The new section 29O(5) clarifies that where the COG's report provides for conditions that must be attached to a development approval, the report may state the entity that is to have jurisdiction for the condition. The section also provides that the condition is taken to be a concurrence agency condition under IPA and should be treated as a concurrence agency condition. Clause 36 inserts a new section 29PA that provides for the administration and enforcement of conditions attached to development approvals granted following completion of an EIS for a significant project. This section provides that when a development approval takes effect, agencies are able to administer the conditions as if assessment had occurred under the referral coordination process within IDAS.

 


 

16 State Development and Other Legislation Amendment Section 29PA(2) provides the COG with the ability to identify and include as part of his or her report prepared pursuant to section 29K, the agency which has jurisdiction for the conditions stated in the report. If the COG's report does not state the entity to have jurisdiction for the conditions, an entity is taken to have jurisdiction if it would have been a referral agency for the application if not for the operation of the provisions of the significant project EIS process; and the condition would have been within the entity's jurisdiction. The provision provides agencies, proponents and the assessment manager with certainty as to the ability to fully administer development approval conditions. The commencement of these provisions is retrospective to clarify the responsibility for the administration of conditions attached to development approvals already granted where following the completion of an EIS for a significant project since the June 1999 amendments to the Act. A new subdivision provides for linkages to the community infrastructure designation process provisions of IPA. Section 29R recognises that pursuant to section 2.6.8 of IPA, provides a process by which a Minister may proceed straight to designation after assessment has been completed for a significant project and for which a report has been prepared pursuant to section 29K of the SDPWO Act. Section 29Q(2) provides that the COG's report evaluating the EIS may recommend requirements for inclusion in the community infrastructure designation. Further, the entity making the community infrastructure designation pursuant to s.2.6.8 of IPA may have regard to the COG's recommendation to ensure that the designation includes any appropriate requirements to address the environmental effects of the proposed use as assessed during the EIS process. Clause 37 replaces existing Division 5 of Part 4 with a new Division 5 which still relates to the interrelationship between the declaration of a significant project relating to mining and the MR Act. Previously section 29R made reference to the COG giving notice in respect of a statement of proposals or environmental management overview strategy which was relevant in applying for mining leases. The recent amendments to the EP Act have removed these matters from the jurisdiction of the Mining Registrar under the MR Act. They are now relevant in relation to the application for an environmental authority (mining lease).

 


 

17 State Development and Other Legislation Amendment A new section replaces the former section 29S which allowed the COG's report to recommend to the MRA Minister the conditions to be attached to any mining lease issued under the MRA for the project. New section 29S provides on a general basis that the COG, in reporting on a significant project, may state conditions for the proposed mining lease and that if a mining lease is granted under the MR Act the COG's conditions are taken to be included as conditions of the mining lease. A new section 29T is inserted. This section makes clear that subject to s.29U, if there is any inconsistency between the conditions of a mining lease as determined under the MR Act and the conditions imposed from a COG's report, then the COG's conditions will prevail to the extent of the inconsistency. Section 29U provides that a native title issues condition prevails over the COG's conditions to the extent of any inconsistency. A new division 5A creates the relationship between the declaration of a significant project under the SDPWO Act and the need for that project where it relates to mining to obtain environmental authorities (mining activities) under the EP Act. A new section 29W provides that the COG's report for a significant project may state conditions for any draft proposed environmental authority (mining lease) relating thereto, to be issued under the EP Act. The section provides for the COG to give a copy of the report to the EPA Minister. Clause 38 amends section 29W which deals with the relationship of the COG's report with other legislation. The amendment clarifies that the COG's report has a relationship with other approval processes in the EP Act outside of that for environmental authorities for mining activities in chapter 2 of the EP Act. Clause 39 amends section 29Y to provide the COG with the ability recommend that an application for an approval be refused; or that stated conditions contained in the COG's report be imposed on an approval. These provisions provide for the application of the COG's report in the consideration of approvals, licences and other permits other than those specifically contemplated in other parts of the Act. Clause 40 amends section 29ZA clarifies that the person considering an approval must take the COG's report into consideration required for a project. The existing provision was ambiguous in that it contemplated a

 


 

18 State Development and Other Legislation Amendment person approving of a project. The amendment makes clear that consideration of the COG's report is linked to the consideration and decision about an approval required under legislation for a project. Clause 41 amends section 68 to include a provision for the COG to delegate to the chief executive of a department the construction of approved works pursuant to section 66. The existing provisions enable the COG to delegate to a local body. The additional ability for the COG to delegate these works to the chief executive of a department recognises that once approved by Governor in Council, the COG is required to undertake the works as soon as is practicable. Before delegating a power, function, or duty conferred on him or her under section 66, the COG is required to obtain the approval of the Governor in Council. Clause 42 inserts a new section 77B to provide that a project board established under the Act is statutory body for the Statutory Bodies Financial Administration Act 1982. The amendment replaces an outdated reference to the Local Bodies Loan Guarantees Act 1923 which has been repealed. Clause 43 amends the provisions in section 78(1) dealing with the power of the COG to take land for the benefit of a third party. The existing provisions provide that the COG can only take land in "an estate in fee simple". The amendment provides for the COG to take "land" as defined in the SDPWO Act. "Land" is defined as "any estate or interest in land, and any easement, right, power or privilege in, over, or in connection with land, and any wharf." The amendment to section 78 will provide for the Coordinator-General to take an interest in land, including an easement. This provision will allow for the taking of an easement to facilitate significant infrastructure facilities where taking land in fee simple would not be warranted to accommodate the project and where the taking of an easement would reduce the potential hardship of affected landowners. The provision is likely to have application in the acquisition process for the PNG and other pipeline proposals. Clause 44 amends section 84 to provide for the COG to negotiate the transfer of approved works to any entity established under an Act. The amendment recognises that upon the completion of authorised works or when works have attained such a stage as to be available to for use for the purpose for which they were undertaken, the COG having taken responsibility for undertaking the works is unlikely to retain ownership of

 


 

19 State Development and Other Legislation Amendment them. However, in line with current trends regarding the ownership of infrastructure, the transfer of works is no longer reasonably constrained to agencies representing the Crown or local bodies as defined in the Act. Under this section, the Coordinator-General would still require the Governor in Council's approval of the terms of any proposed transfer. Clause 45 removes outdated finance provisions by deleting sections 95 to 101A. This amendment is consistent with current legislative provisions regarding financial arrangements. The amendment provides for the substitution of the COG's existing express financial powers with a cross-reference to the relevant provisions of the Statutory Bodies Financial Arrangements Act 1982 (SBFA Act). A new section 95(1) provides that the COG is a statutory body for the SBFA Act and clarifies that the SBFA Act sets out the way in which the COG's powers are affected. Clause 46 inserts a new section dealing with publication of information by the COG. New section 119(A)(1) provides that where the COG is required to notify a document of information, notification must be made by placing the information on the department's website or such other website considered appropriate by the COG. No limitation is placed on the COG also publicly notifying documents and information in other ways such as newspaper advertisements. Clause 47 amends the regulation making ability to clarify that the provisions relating to the use by the public and the safeguarding of securing against trespass, injury, misuse or relates to authorised works approved pursuant to section 66. Section 121(1)(i) updates the penalty units from $50 to 20 penalty units, which addresses the outdated penalty provision and updates it with a more appropriate provision. Clause 48 further amends section 121(1) to provide for the making of regulations for with respect to environmental impact statements or processes, such as those proposed to be accredited under a bilateral agreement made pursuant to the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act). Under the provisions of the EPBC Act, in order to be accredited by the Commonwealth, the State's assessment process must be in law. The amendments provide that additional benchmarks required by the Commonwealth can be included in

 


 

20 State Development and Other Legislation Amendment the EIS process provided in Part 4 of the Act by way of Regulation. This allows Part 4 to remain intact while providing that additional requirements for EISs (where there is a matter of national environmental significance) set by the Commonwealth can be incorporated in the process without fettering the discretion of the COG. A new provision is provided in the transitional provisions contained in section 123. The section is amended to include the ability for the COG to declare as a significant project, a project which includes land intended to be designated as community infrastructure pursuant to IPA for which a study about the environmental effects of the proposal was being undertaken. This amendments provides recognition that the transitional arrangements should apply for an EIS or similar study being prepared for a project on land that is proposed to be designated for community infrastructure rather than requiring a development approval. © State of Queensland 2000

 


[Index] [Search] [Download] [Bill] [Help]